[Snakeroot Organic Farm logo]
 • HOME
 • What's New Here
 • Snakeroot Poultry

THE BASICS
 • About Our Farm
 • Annual Farm Tour
 • Community Supported
    Agriculture Plan (CSA)
 •
Directions to our Farm
 • From a Run Out Hayfield to
    a Prosperous Organic Farm
    in Ten Easy Years

 • Get Real. Get Organic!
 • History of Our Farm
 • Pictures of the Farm
 • Where We Buy
 • Where We Sell
 • Our Yearly Work Schedule
 • Just Pretty
 • Subscribe to our e-newsletter.
 • Newsletter Archive.
 • What We Will & Won't Ship

OUR PEOPLE
 • Working Here
 • Our Apprentices
 • Our Farm Workers
 • Pictures of Us at Market

WHAT WE GROW
 • Fresh Vegetables
 • Fresh Fruit
 • Fresh Herbs
 • Perennials
 • Aloe - a magical plant
 • Our Bird Houses
 • Lupines
 • Rosemary Plants
 • Lovage, Tansy & Yarrow
 • Our Product Brochures
 • Dried Vegetables
 • Dried Culinary Herbs
MAPLE
 • Maple Syrup
 • Maple Syrup, p.2
 • Sugarin' Is Like Ice Fishin'
 • Our New Sugarhouse
TOMATOES
 • Tomato Seedlings
 • Tomato Seeds We Offer
 • Tomato Seed Production
 • Paste Tomatoes
GARLIC
 • About Garlic
 • Garlic for Sale
 • Garlic Year Round
 • Mulching Garlic
 • Growing Rounds from Bulbils
 • Whole Bulbil Cluster Method
 • Planting Garlic

MULCHING
 • Using Mulches
 • Combatting Quackgrass
    with Mulch

 • We Want Your Leaves!
 • In Praise of Chips

FOOD & FARMING INFO
 • Buying in Bulk for
    Storage, Canning & Freezing

 • Winter Storage Tips
 • How to Freeze Our Veggies
 • Building Techniques
 • Our Outbuildings
 • Evolution of the Farm Table
 • The Story of Our Cooler
 • Prepping Veggies for Market
 • Crop Rotations
 • Drip Irrigation
 • Low Pressure Water
 • Planting with Spreadsheets
 • Greenhouse Vegetable
    Production

 • Let-tuce Begin
 • Recipe Favorites
 • Our "Remay Roller"
 • Gardening Class Notes
 • Your Most Expensive Crop

OPINIONS & IDEAS
 • Being Green
 • Digging Potatoes by Hand
 • Farmers' Markets in 2012
 • History of Pittsfield
 • Hybrids or Open Pollinated?
 • Making Websites
 • Open Source Software

FARM TRANSITION…
    Our Retirement Plan
 • How Should a Farmer Retire?
 • Impediments to the want-to-be     farmer
 • Reducing the Value
    of the Land

 • Who Will Farm Here When
    We're Gone?

 • Apprentice Terms and Stages
 • From Apprentices to Partners
 • Transferring Farm Ownership





…and now for something completely different…

At dawn
Canoe bow waves are quickly lost
    on the shoreside
But go on out of sight
    on the lake side.

-1986


The constant swish-swish of skis
    On a day long ski.
The constant swish-swish of wiper blades
    On a day long drive.

-1990


My dog, trotting barefoot
Steps on a garden slug
And thinks
Nothing of it.

-1999


Word spreads quickly
as I approach the pond.
All becomes quiet.

-1997


Hidden in the vines
a large warted cucumber
jumps out of reach.
A toad!

-1997


Delicate puffs
of marshmallow snow
carefully perched
on a branch,
await the trigger of my hat
to melt their way down my back.

-2010
Deep in the tomato jungle
Fruits of yellow, purple and red
Tell of their readiness
To go to market.

-2010
Sugarin' Chores
Snowflakes hurry through my flashlight beam,
As my boots knead new snow with spring mud,
On my nightly Hajj to keep the boil alive,
For as long as possible until the dawn,
To match the power of the flowing sap,
With my meager evaporator and will.
The prize at the finish line are jars of syrup
And Spring.

-2013

Building our new sugarhouse
Built in late November 2013 with help from Alyssa, Elmer, Jess, Ryan, Jason, and Alex.

Click on photos to enlarge.        

In 1997 we started tapping our maple trees. At that time we tapped about ten trees and we boiled down the sap in the house on a wood cookstove. By 1998 we were tapping over fifty trees and we were beginning to use maple tubing to collect the sap into one location. We purchased the smallest evaporator we could find and built a small 12' x 12' shed in the woods (photo, right) to house the evaporator and boil sap. By 2000 we were placing about 125 taps.


Over the next few years as we gradually expanded the sugarbush to more remote sections of the woods, and as we expanded to over 200 taps we found ourselves hauling sap a quarter mile uphill to our sugarhouse. So in the fall of 2002 we built a larger sugarhouse further down into the woods (photos, right and below) where all the sap could arrive via tubing. This has served us well for eleven years. Yet the sugarbush has been maturing and each year or two we add a few more trees to the lines. We are now placing around 450 taps every spring. For the past several years we have been boiling nonstop during sugaring season from eight in the morning until ten at night, and yet we still predictably fall behind by several days at the height of the season. We clearly needed a larger evaprator, but a larger evaporator would not fit into our current sugahouse.

The hours spent boiling sap is a great time to contemplate the future. Did we want to expand the current sugarhouse or should we build another one? And if so, where? How would we get all the sap to it? How would we get the firewood to it? For three years we mulled over these questions and finally decided to build a little further downhill in the woods, a few hundred feet from our second sugarhouse. In the spring of 2013 as the snow began to retreat from sections of the woods we scouted out a suitably level location and began to clear a road to it through the woods. Then maple season ended and our attention progressed from the woods and sugarbush to the greenhouses and fields and farmers' markets.

In November work began again with fellingWoodshed skeleton almost completed. and limbing trees, some of which we would use to build the structure and some we would cut to four foot lengths for firewood. Since the crew working in this project (Ryan, Alex, Jess and Alyssa) had never built a log pole structure before, we began by building a free standing 8' x 18' woodshed (photo, right and below), using old greenhouse plastic for the roof. Aside from being a good training excercise, this also provided a place to put all the firewood once it was cut. Clearing away the firewood left more room to lay out and review the poles we would be building with.Woodshed completed.

The sill logs to be used would have to be quite sizeable for a larger building like the sugarhouse was to be. A green 30' spruce log tends to be quite heavy, and it took a minimum of three of us to wrestle two of them into position, one after the other. Once we had them laid out, it was decided to re-orient the building by 90 degrees. More wrestling. Then the cross pieces were nailed into place and fourteen 6' verticals cut, nailed into position and braced. For a much more detailed explanation (with lots of photos) of how we put such log pole structures together, see our page on Building Techniques.

Jess and Alex putting up the first vertical.

Moving

Construction of the sugarhouse went along quickly once the newly trained crew had the experience of building the woodshed under their belts. Jess, Ryan and Alex erected all 14 verticals, on top of which they attached each two-piece top sill. Then came the seven cross pieces connecting the top sills, and on them the seven short verticals supporting the two-piece ridge pole. Elmer secured the rafter poles by screwing them to the ridgepole as Alyssa nailed them to the tops sill. The overhanging of the rafters were cut off after they were secured in place.

Top sills on. Rafters on. Once the skeleton of the sugarhouse was completed, we were faced with putting a roof on it. In the past on a building of this size I have covered the rafters with OSB, then tar paper, then asphalt shingles. While this produces a good and long lasting roof, I was never pleased with the time, effort and skill it took to build. So I decided to try a steel roof instead. I had never installed a steel roof before, and the major worry was how it would be attached given the irregular poles being used for rafters.

Purlins on North side. Purlins on South side. The solution was to use 2x4's for the purlins, which smoothed out many of the irregularities. Two 16-footers stretched the length of the roof, and we used 30 of them. Luckily our new box truck that we had been going to market with was just the vehicle to haul them home. A call to Mid Maine Metal in Newport and a visit to their website allowed me to calculate how much steel to order and to estimate the cost. The custom-cut order was ready in a few days and again our box truck was ideal for bringing them back to the farm. We opted for one section of polycarbonate as a skylight, a feature we discovered in our second sugarhouse to be a real asset.

We used the tractor and firewood trailer to haul both the 2x4's and the metal roofing to a location close to the building site, then carried them to the site by hand. We placed the 2x4's every two feet—the maximum recommended since we knew the location would not be a windy one. Jason, Alyssa and I moved the steel into position and took turms climbing up onto the roof to screw it on. The next day it rained heavily. Finally I had to straddle the top to screw on the ridge cap. The building was now minimally ready for winter, and we can continue to work on the inside under cover. During the winter we will construct the shelving, put in a floor and add a cut-to-length firewood stacking area as we have the time and can afford the materials.

Steel finally on - west side. Steel finally on - east side The tools for this entire job consisted of 3 hammers, a portable drill (and 7 rechargable batteries!), a chainsaw, 3 ladders, 2 machetes, and a 25' tape measure (photo, below left). The major costs, aside from paying the crew, were $250 for 2x4's for the roof purlins, $980 for the steel roofing, and around $200 for about 30 lbs. of nails and screws; this comes to about $1500 in all, which is not bad for a 30' x 22' building. Of course we still have to put in a floor in 2/3 of the building and purchase a new evaporator which will cost at least twice what the building cost. That purchase, and re-roouting the maple lines to the new sugarhouse, will probably have to wait for the 2015 season. Although much of the work could have been done by a single person, the minimum number of people would have been two, but a third and sometimes fourth person sure came in handy for some of the work. The entire project, from clearing the woods to attaching the roof took about two weeks.

The Tools. Shelves. Tune in later as we continue our work on this sugarhouse. Visit us during sugaring season (late Feb. to early Mar.) to see a really low budget sugaring operation built over fifteen years and to see the new sugarhouse in person.



27 Organic Farm Road, Pittsfield Maine 04967
http://www.snakeroot.net/farm
owned and operated by
Tom Roberts & Lois Labbe
Tom: Tom@snakeroot.net (cell) 207-416-5417
or
Lois: Lois@snakeroot.net (cell) 207-416-5418

Gardening for the public since 1995.



top of page File name: NewSugarhouse.shtml
Version: Monday 23 December, 2013
Creative Commons License This website is licensed under a
Creative Commons Attribution-ShareAlike 3.0 Unported License.